Current Time - 08:40:19  
Punjab SLDC

Calendar
 
Contact Info
ce-sldc@punjabsldc.org
Phone: 0175-2367490
Fax: 0175-2365340
Availability as per Installed Ca

INSTALLED CAPACITY of PSPCL for FY 2017-18 as on 28.02.2018

Name of Project

No. of Units

MW

Gross Installed Capacity (MW)

GNDTP, Bathinda

0

0

Total

0.00

GGSSTP, Ropar

4

210

840.00

GHTP, Lehra Mohabbat (Unit # 1 & 2) (Stage-I)

2

210

420.00

GHTP, Lehra Mohabbat (Unit # 3 & 4) (Stage-II)

2

250

500.00

 

Total

920.00

TOTAL THERMAL

 

 

1760.00

Shanan

4

15

60.00

1

50

50.00

Total

110.00

UBDC-I

3

15

45.00

UBDC-II

3

15.45

46.35

 

Total

91.35

**RSPP

4

150

600.00

Less 20% J&K and 4.6% HP share from RSD

-147.60

Net RSD share of Punjab

452.40

ASHP

4

33.5

134.00

MHP-1&2

6

15

90.00

MHP-3&4

6

19.5

117.00

MHP-5

2

18

9.00

 

Total

225.00

Mini/Micro Hydel

 

 

 

5.60

TOTAL HYDRO

 

 

1018.35

TOTAL(HYDRO+THERMAL)

2778.35

PEDA & NRSE Private Projects within Punjab (excluding PSPCL's Own NRSE Projects i.e. UBDC & Mini/Micro Hydel Projects)

1232.07

Rajpura TPP

2

700

1400.00

Talwandi Sabo TPP

3

660

1980.00

GVK TPP

2

270

540.00

Total Installed Capacity within the State

7922.92

 

NRSE Private Projects outside Punjab

65.00

Central Sector (FIRM Share only)

4234.42

Share from BBMB

1161.28

Total Gross Installed Capacity (from all sources)

13391.12